Independent commercial fit-out contract review - get expert advice before signing Newcastle Upon Tyne
OMMC is a UK-based independent commercial fit-out advisory firm working exclusively on the client side before contractor appointment.

About to Sign a Fit-Out Contract?
Get Independent Commercial Clarity Before You Commit.

Independent commercial fit-out reviews that uncover inflated costs, hidden markups, and unnecessary specifications — before you commit.

OMMC helped Entrepreneurs Circle save more than £250,000 on its 16,000 sq ft commercial fit-out.

Client-side. Independent. No contractor incentives.

Most Businesses Don't Realise They're Overpaying Until It's Too Late

If you're facing a commercial fit-out, refurbishment, or relocation, you're probably dealing with:

  • Quotes that feel expensive but hard to challenge
  • Vague scopes and technical jargon
  • "That's just what it costs" answers
  • Pressure to sign quickly
  • No internal construction expertise

Contractors are not charities.

Their job is to maximise margin — not protect your budget.

OMMC sits on your side of the table.

What OMMC Actually Does

We help businesses avoid expensive fit-out mistakes.

You bring us:

  • Contractor quotes
  • Designs
  • Scopes
  • Budgets

We show you:

  • Where costs are inflated
  • What's unnecessary
  • What can be challenged
  • What a realistic budget should be
Premium boardroom fit-out with city views - where major decisions are made

The Result?

Sometimes the review identifies substantial savings. Sometimes it exposes scope gaps, unnecessary specification or commercial risk before they become committed costs. Sometimes it confirms that the proposal is broadly sound.

Either way, you make the decision with greater clarity and control.

Independent Fit-Out Review

Fixed-fee, pre-contract commercial review designed to identify cost inflation, scope risk, and margin stacking before you sign.

If you're reviewing a contractor quote before committing, you can check your cost position here.

From £3,500

Request Independent Review

More Than £250,000 Saved on a 16,000 sq ft Commercial Fit-Out

£1,000,000+

Original contractor proposal

£250,000+

Confirmed savings

Entrepreneurs Circle

Client — confirmed by Nigel Botterill

What we uncovered:

  • Inflated trade costs
  • Over-specified systems
  • Duplicated scopes
  • Unnecessary risk pricing

The client said:

"Having someone who wasn't trying to win the job—but actually protect our interests—made all the difference."
Read the Full Case Study

30 Years Inside the System. Now Working Outside It.

Craig spent three decades in construction — from site management to main contracting.

Craig Eldred has spent over 30 years in commercial fit-out and construction, working across delivery, pricing, and project leadership. Learn more about Craig Eldred.

He's seen how projects really work:

  • Where costs get hidden
  • How margins are layered
  • Why clients lose control

OMMC was built for one reason:

To give businesses an independent voice before they spend six or seven figures on construction.

AI and systems power the analysis.
But the mission is simple:

👉 Protect the client.

Learn More About OMMC

Where Are You Right Now?

1) About to sign a contractor quote

Get an independent review before you commit.

Request Independent Review

2) Mid-project and worried about costs

We can help you regain control.

Request Independent Review

3) Planning a relocation or refurbishment

Start with the right commercial foundation.

Book a Conversation

4) Reviewing a Quote or Preparing to Tender

You have a contractor quote or are about to go to tender — but something doesn't feel right in the numbers.

Check Your Cost Position

Ready to Protect Your Fit-Out Budget?

Get an independent commercial review before you sign anything.

Request Independent Review